Construction of Facilities regarding the Century Mine Panel 23E Subsdidence Mitigation Project
From the ProvenHand pipeline wiki
Construction of Facilities regarding the Century Mine Panel 23E Subsdidence Mitigation Project is a natural gas pipeline replacement in Ohio, operated by Texas Eastern Transmission, LP.
| Construction of Facilities regarding the Century Mine Panel 23E Subsdidence Mitigation Project | |
|---|---|
| General information | |
| Project type | Replacement[1] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| State | Ohio[1] |
| Counties | Monroe[1] |
| FERC docket | CP10-466[2] |
| Contractors | |
| Technical information | |
| Pipe size | 30", 36"[1] |
| Cost | $18.4 million[1] |
| On ProvenHand | |
| Hands listed | 0 |
Construction of Facilities regarding the Century Mine Panel 23E Subsdidence Mitigation Project is a natural gas pipeline replacement in Ohio, operated by Texas Eastern Transmission, LP.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| CH2M HILL, Inc.[1] | Erosion and sedimentation control plan (consultant memo) | Consultant memo on erosion and sedimentation controls for longwall-mining stabilization projects, attached to the advance notification |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Construction of Facilities regarding the Century Mine Panel 23E Subsdidence Mitigation Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Advance Notification of Construction of Facilities, Century Mine Panel 23E Subsidence Mitigation Project, Texas Eastern Transmission, LP (CP10-466)”. Texas Eastern Transmission, LP (filed with FERC). 25 June 2010. Retrieved 4 October 2026.
- “FERC eLibrary docket CP10-466”. Federal Energy Regulatory Commission. 25 June 2010. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.