Corpus Christi Stage III Pipeline is a natural gas pipeline expansion in Texas, operated by Cheniere Energy Corpus Christi. It runs 21 miles of 42" pipe.

Corpus Christi Stage III Pipeline
General information
KindPipeline project[1]
Project typeExpansion[2]
StatusUnder construction[2]
CommodityNatural gas[2][3]
Operator
Owners and operators
Facility project
StateTexas[2][3]
CountiesSan Patricio[3]
Approved10 October 2019[1] or 22 November 2019[3][sources disagree]
FERC docketCP18-513[1]
Technical information
Length21 mi[2][3]
Pipe size42"[2][3]
Capacity1530 MMcf/d additional capacity (EIA)[2] or approximately 1.5 Bcf/d, bi-directional[3][sources disagree]
Cost$312 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Corpus Christi Stage III Pipeline is a natural gas pipeline expansion in Texas, operated by Cheniere Energy Corpus Christi. It runs 21 miles of 42" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Approved
  • 10 October 2019[1]
  • 22 November 2019[3]
Capacity
  • 1530 MMcf/d additional capacity (EIA)[2]
  • approximately 1.5 Bcf/d, bi-directional[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Corpus Christi Stage III Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Granting Authorizations under Sections 3 and 7 of the Natural Gas Act, Corpus Christi Liquefaction Stage III, LLC et al., Stage 3 Project (CP18-512 et al.)”. FERC. 22 November 2019. Retrieved 4 October 2026.
  4. “FERC eLibrary docket CP18-513”. Federal Energy Regulatory Commission. 28 June 2018. Retrieved 3 October 2026.
  5. “Notification of In Service, Unit No. 1 of the Sinton Compressor Station expansion, Cheniere Corpus Christi Pipeline, L.P. (CP18-513)”. Cheniere Corpus Christi Pipeline, L.P. (filed with FERC). 27 January 2021. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.