Cove Mountain Road Crossing Replacement Project
From the ProvenHand pipeline wiki
Cove Mountain Road Crossing Replacement Project is a pipeline replacement, operated by Texas Eastern Transmission, LP.
| Cove Mountain Road Crossing Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Owner and operator | |
| Counties | Blair[2] |
| FERC docket | CP25-28[1] |
| Technical information | |
| Pipe size | 24", 30"[2] |
| Cost | $17.4 million[2] |
| On ProvenHand | |
| Hands listed | 0 |
Cove Mountain Road Crossing Replacement Project is a pipeline replacement, operated by Texas Eastern Transmission, LP.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Cove Mountain Road Crossing Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-28”. Federal Energy Regulatory Commission. 5 December 2024. Retrieved 3 October 2026.
- “Environmental Assessment Report for Texas Eastern Transmission, LP's Sections 157.205 and 157.208 under CP25-28.”. Federal Energy Regulatory Commission (staff document). 7 February 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.