Creole Trail Pipeline Expansion Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Creole Trail Pipeline Expansion Project is a natural gas pipeline reversal in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P.. It entered service in 2015. It runs 0 miles of 42" pipe.

Creole Trail Pipeline Expansion Project
Also calledCreole Trail Expansion Project 1[1]
General information
KindPipeline project[1]
Project typeReversal[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
Facility project
StateLouisiana[1][2]
CountiesBeauregard, Cameron[4]
Approved21 February 2013[1]
In service27 April 2015[2]
FERC docketCP12-351[1]
Technical information
Length0 mi[2]
Pipe size42"[2]
Capacity1530 MMcf/d (FERC project list)[1] or 1500 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$100 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Creole Trail Pipeline Expansion Project is a natural gas pipeline reversal in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P.. It entered service in 2015. It runs 0 miles of 42" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1530 MMcf/d (FERC project list)[1]
  • 1500 MMcf/d additional capacity (EIA)[2]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Creole Trail Pipeline Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Cheniere Creole Trail Pipeline, L.P., Creole Trail Expansion Project (CP12-351)”. FERC (order). 21 February 2013. Retrieved 4 October 2026.
  4. “Bi-weekly construction status report, May 1-15, 2014, Creole Trail Expansion Project (CP12-351)”. Cheniere Creole Trail Pipeline, L.P. (filed with FERC). 22 May 2014. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.