Cromwell Compressor Units Replacement Project is a facility project in Connecticut, operated by Algonquin Gas Transmission, LLC. Construction began in 2018.

Cromwell Compressor Units Replacement Project
General information
KindFacility project[1]
Project typeRebuild[1]
StatusUnder construction[2]
Owner and operator
StateConnecticut[1]
CountiesMiddlesex[1]
Approved10 August 2018[2]
Construction started4 October 2018[2]
FERC docketCP18-519[3]
Technical information
Units added1 (gas turbine, 6,300 hp each); 1 (gas turbine, 7,700 hp each)[1]
Cost$80 million (cost stated in FERC staff EA)[4]
On ProvenHand
Hands listed0

Cromwell Compressor Units Replacement Project is a facility project in Connecticut, operated by Algonquin Gas Transmission, LLC. Construction began in 2018.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Cromwell Compressor Units Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “30-day advance notification under 18 CFR 2.55(b), Cromwell Compressor Units Replacement Project (CP18-519)”. Algonquin Gas Transmission, LLC (filed with FERC). 10 July 2018. Retrieved 3 October 2026.
  2. “Informational filing, Cromwell Compressor Units Replacement Project (CP18-519)”. Algonquin Gas Transmission, LLC (filed with FERC). 17 June 2019. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP18-519”. Federal Energy Regulatory Commission. 10 July 2018. Retrieved 3 October 2026.
  4. “Environmental Assessment Report, Cromwell Compressor Units Replacement Project (CP18-519)”. FERC. 18 July 2018. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.