Cromwell Compressor Units Replacement Project
From the ProvenHand pipeline wiki
Cromwell Compressor Units Replacement Project is a facility project in Connecticut, operated by Algonquin Gas Transmission, LLC. Construction began in 2018.
| Cromwell Compressor Units Replacement Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Rebuild[1] |
| Status | Under construction[2] |
| Owner and operator | |
| State | Connecticut[1] |
| Counties | Middlesex[1] |
| Approved | 10 August 2018[2] |
| Construction started | 4 October 2018[2] |
| FERC docket | CP18-519[3] |
| Technical information | |
| Units added | 1 (gas turbine, 6,300 hp each); 1 (gas turbine, 7,700 hp each)[1] |
| Cost | $80 million (cost stated in FERC staff EA)[4] |
| On ProvenHand | |
| Hands listed | 0 |
Cromwell Compressor Units Replacement Project is a facility project in Connecticut, operated by Algonquin Gas Transmission, LLC. Construction began in 2018.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Cromwell Compressor Units Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “30-day advance notification under 18 CFR 2.55(b), Cromwell Compressor Units Replacement Project (CP18-519)”. Algonquin Gas Transmission, LLC (filed with FERC). 10 July 2018. Retrieved 3 October 2026.
- “Informational filing, Cromwell Compressor Units Replacement Project (CP18-519)”. Algonquin Gas Transmission, LLC (filed with FERC). 17 June 2019. Retrieved 3 October 2026.
- “FERC eLibrary docket CP18-519”. Federal Energy Regulatory Commission. 10 July 2018. Retrieved 3 October 2026.
- “Environmental Assessment Report, Cromwell Compressor Units Replacement Project (CP18-519)”. FERC. 18 July 2018. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.