CTPL Expansion Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
CTPL Expansion Project is a natural gas pipeline expansion in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P..
| CTPL Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1][2] |
| Status | Proposed[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Louisiana[2][3][4] |
| Counties | Beauregard, Cameron[4] |
| FERC docket | CP25-506[1] |
| Technical information | |
| Capacity | 900 MMcf/d (FERC project list)[3] or 930 MMcf/d additional capacity (EIA)[2][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
CTPL Expansion Project is a natural gas pipeline expansion in Louisiana, operated by Cheniere Creole Trail Pipeline, L.P..
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on CTPL Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-506”. Federal Energy Regulatory Commission. 6 June 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.
- “Notice of Availability of the Final Environmental Impact Statement, Sabine Pass Stage 5 Expansion Project (CP24-75 et al., including CP25-506)”. FERC. 25 September 2026. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.