Curryville Compression Expansion Project is a natural gas pipeline expansion in Missouri, operated by MoGas Energy LLC. It entered service in 2009.
| Curryville Compression Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| Facility project | |
| State | Missouri[1] |
| Counties | Pike[3] |
| Approved | 25 September 2008[3] |
| In service | 20 March 2009[1] |
| FERC docket | CP07-450[1] |
| Technical information | |
| Cost | $16.1 million (EIA estimate; no dollar year given)[1] or $16,129,209 actual cost (estimate $6,580,000)[3][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Curryville Compression Expansion Project is a natural gas pipeline expansion in Missouri, operated by MoGas Energy LLC. It entered service in 2009.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Curryville Compression Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP07-450”. Federal Energy Regulatory Commission. 21 September 2007. Retrieved 3 October 2026.
- “Cost of Construction Report, Curryville Compressor Station (CP07-450)”. MoGas Pipeline LLC (filed with FERC). 23 December 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.