D74 Booster Compressor Project

From the ProvenHand pipeline wiki

D74 Booster Compressor Project is a pipeline project, operated by Columbia Gas Transmission, LLC.

D74 Booster Compressor Project
General information
Project typeNew build[1]
Owner and operator
CountiesOttawa[1]
Approved6 May 2025[3]
FERC docketCP25-83[2]
Technical information
Units added1 × Caterpillar G3512JLE (1,035 hp each)[1]
Horsepower added1,035 hp[1]
Cost$16,000,000[1]
On ProvenHand
Hands listed0

D74 Booster Compressor Project is a pipeline project, operated by Columbia Gas Transmission, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on D74 Booster Compressor Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Environmental Assessment Report for Columbia Gas Transmission, LLC's Sections 157.205 and 208 –Prior Notice Filing– Construction of Natural Gas Facilities under CP25-83.”. Federal Energy Regulatory Commission (staff document). 5 May 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP25-83”. Federal Energy Regulatory Commission. 25 February 2025. Retrieved 3 October 2026.
  3. “Columbia Gas Transmission, LLC submits Final Weekly Construction Status Report No. 32 for the period of 01/19/2026 to 01/25/2026 re the D74 Booster Compressor Project under CP25-83.”. Columbia Gas Transmission, LLC (filed with FERC). 29 January 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.