Dauphin Island Gathering System CP97-300
From the ProvenHand pipeline wiki
Dauphin Island Gathering System CP97-300 is a pipeline project in Alabama, operated by Dauphin Island Gathering System. It runs 63 miles.
| Dauphin Island Gathering System CP97-300 | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Owner and operator | |
| State | Alabama[1] |
| Approved | 27 June 1997[1] |
| FERC docket | CP97-300[1] |
| Technical information | |
| Length | 63 mi[1] |
| Capacity | 200 MMcf/d (FERC project list)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Dauphin Island Gathering System CP97-300 is a pipeline project in Alabama, operated by Dauphin Island Gathering System. It runs 63 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Dauphin Island Gathering System CP97-300? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.