Dearborn County Lateral Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Dearborn County Lateral Project is a natural gas pipeline lateral in Indiana, Kentucky and Ohio, operated by Texas Gas Transmission, LLC.

Dearborn County Lateral Project
General information
KindPipeline project[1]
Project typeLateral[1][2][3]
StatusProposed[2][4][5]
CommodityNatural gas[2][3]
Owner and operator
StatesIndiana, Kentucky, Ohio[2][6]
CountiesIndiana: Dearborn
Kentucky: Boone

Ohio: Hamilton
[3][6]
FERC docketCP26-536[1]
Contractors
Technical information
Length12 mi[2] or 11.8 mi[4][6][sources disagree]
Pipe size20"[2][3][4]
Capacity265 MMcf/d additional capacity (EIA)[2] or 265,000 Dth/d of new firm lateral transportation capacity[3][sources disagree]
Cost$86 million (EIA estimate; no dollar year given)[2] or approximately $86.2 million (Exhibit K total $86,247,503; no dollar year given)[3][sources disagree]
On ProvenHand
Hands listed0

Dearborn County Lateral Project is a natural gas pipeline lateral in Indiana, Kentucky and Ohio, operated by Texas Gas Transmission, LLC.

Contractorsedit

ContractorWorkScope
Perennial Environmental Services, LLC[3]Environmental consultant (resource report research)Agency and local planning contacts for the cumulative impacts analysis in Resource Report 1 (April 2026)

Spreads

Spread
Single spread[3]

Crossings

FeatureMethod
Interstate 275 and unnamed tributaries (HDD-200, MP 9.29-9.51)[3]HDD
Ohio River, Tanners Creek, wetlands, unnamed tributaries and a railroad (HDD-100, MP 5.12-6.17)[3]HDD
Ohio River, a wetland and an unnamed tributary (HDD-300, MP 10.80-11.55)[3]HDD
Wetland, unnamed tributary and the Miami Fort plant coal supply pile (HDD-400, MP 11.55-11.81)[3]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 265 MMcf/d additional capacity (EIA)[2]
  • 265,000 Dth/d of new firm lateral transportation capacity[3]
Cost
  • $86 million (EIA estimate; no dollar year given)[2]
  • approximately $86.2 million (Exhibit K total $86,247,503; no dollar year given)[3]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Dearborn County Lateral Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-536”. Federal Energy Regulatory Commission. 29 May 2026. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Abbreviated Application for a Certificate of Public Convenience and Necessity, Dearborn County Lateral Project (CP26-536), Volume I with Resource Report 1 and Appendix 1B”. Texas Gas Transmission, LLC (filed with FERC). 29 May 2026. Retrieved 3 October 2026.
  4. “Notice of Schedule for the Preparation of an Environmental Assessment for the Dearborn County Lateral Project (CP26-536)”. Federal Energy Regulatory Commission. 30 July 2026. Retrieved 3 October 2026.
  5. “Dearborn County Lateral Project”. Boardwalk Pipelines, LP. Retrieved 3 October 2026.
  6. “Notice of Scoping Period Requesting Comments on Environmental Issues for the Proposed Dearborn County Lateral Project (CP26-536)”. Federal Energy Regulatory Commission. 26 June 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.