Decatur Power Lateral
From the ProvenHand pipeline wiki
Decatur Power Lateral is a natural gas pipeline lateral in Alabama, operated by MidCoast Pipeline Co. It entered service in 2002. It runs 50 miles of 30" pipe.
| Decatur Power Lateral | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| State | Alabama[1] |
| In service | June 2002[1] |
| Technical information | |
| Length | 50 mi[1] |
| Pipe size | 30"[1] |
| Capacity | 160 MMcf/d additional capacity (EIA)[1] |
| Cost | $23 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Decatur Power Lateral is a natural gas pipeline lateral in Alabama, operated by MidCoast Pipeline Co. It entered service in 2002. It runs 50 miles of 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Decatur Power Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.