Demicks Lake-Cherry Creek Pipeline Project
From the ProvenHand pipeline wiki
Demicks Lake-Cherry Creek Pipeline Project is a natural gas pipeline lateral in North Dakota, operated by WBI Energy Transmission, Inc.. It runs 12.2 miles of 20" pipe.
| Demicks Lake-Cherry Creek Pipeline Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1][2] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | North Dakota[1] |
| Counties | McKenzie[4] |
| In service | 30 October 2019[1] or September 2019[5][sources disagree] |
| FERC docket | CP19-27[1] |
| Technical information | |
| Length | 12.2 mi[1] |
| Pipe size | 20"[1][4] |
| Capacity | 175 MMcf/d additional capacity (EIA)[1] |
| Capacity added | increased capacity by 175 MMcf per day[5] |
| Cost | $29.5 million (EIA estimate; no dollar year given)[1][4] |
| On ProvenHand | |
| Hands listed | 0 |
Demicks Lake-Cherry Creek Pipeline Project is a natural gas pipeline lateral in North Dakota, operated by WBI Energy Transmission, Inc.. It runs 12.2 miles of 20" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Demicks Lake-Cherry Creek Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Weekly Construction Progress Report No. 30 (final), Demicks Lake - Cherry Creek Pipeline Project (CP19-27)”. WBI Energy Transmission, Inc. (filed with FERC). 30 October 2019. Retrieved 4 October 2026.
- “FERC eLibrary docket CP19-27”. Federal Energy Regulatory Commission. 18 December 2018. Retrieved 3 October 2026.
- “Notice of Request Under Blanket Authorization, WBI Energy Transmission, Inc. (CP19-27)”. Federal Energy Regulatory Commission. 28 December 2018. Retrieved 4 October 2026.
- “MDU Resources Group, Inc. Form 10-Q for the quarter ended September 30, 2019 (growth projects)”. MDU Resources Group, Inc. (SEC filing). 1 November 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.