Dominion Energy Transmission Tri-West Project
From the ProvenHand pipeline wiki
Dominion Energy Transmission Tri-West Project is a natural gas pipeline expansion in Ohio and Pennsylvania, operated by Dominion Energy Transmission Co. It entered service in 2020.
| Dominion Energy Transmission Tri-West Project | |
|---|---|
| Also called | Tri-West Project[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1][2] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| States | Ohio, Pennsylvania[1][4] |
| Counties | Licking, Tuscarawas[4] |
| In service | 28 August 2020[1][2] |
| FERC docket | CP20-23[1] |
| Technical information | |
| Length | 1.8 mi[1] or 1.7 mi[4][sources disagree] |
| Pipe size | 20"[4] |
| Capacity | 120 MMcf/d additional capacity (EIA)[1] |
| Capacity added | 120,000 dekatherms per day of firm natural gas transportation service[4] |
| Cost | $24 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Dominion Energy Transmission Tri-West Project is a natural gas pipeline expansion in Ohio and Pennsylvania, operated by Dominion Energy Transmission Co. It entered service in 2020.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Dominion Energy Transmission Tri-West Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Weekly environmental status report, Tri-West Project (CP20-23)”. Dominion Energy Transmission, Inc. (filed with FERC). 22 October 2020. Retrieved 4 October 2026.
- “FERC eLibrary docket CP20-23”. Federal Energy Regulatory Commission. 10 December 2019. Retrieved 3 October 2026.
- “Notice of Request Under Blanket Authorization, Dominion Energy Transmission, Inc. (CP20-23)”. Federal Energy Regulatory Commission. 17 December 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.