Dominion Energy Transmission West Loop Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Dominion Energy Transmission West Loop Project is a natural gas pipeline in Ohio and Pennsylvania, operated by Dominion Energy Transmission Co. It runs 5.1 miles of 36" pipe.

Dominion Energy Transmission West Loop Project
Also calledWest Loop Project[1]
General information
KindPipeline project[1]
Project typeExpansion[1] or Loop[2][3][sources disagree]
StatusIn service[1][4]
CommodityNatural gas[1][3]
Operator
Owner and operator
StatesOhio, Pennsylvania[1][4]
CountiesOhio: Carroll
Pennsylvania: Beaver
[4]
Approved19 December 2019[3]
In service9 June 2021[1] or 1 July 2021[4][sources disagree]
FERC docketCP19-26[1]
Technical information
Length5.1 mi[1][3]
Pipe size36"[1][3]
Capacity150 MMcf/d additional capacity (EIA)[1] or up to 150,000 dekatherms per day[3][sources disagree]
Cost$94.2 million (EIA estimate; no dollar year given)[1] or approximately $94 million[3][sources disagree]
On ProvenHand
Hands listed0

Dominion Energy Transmission West Loop Project is a natural gas pipeline in Ohio and Pennsylvania, operated by Dominion Energy Transmission Co. It runs 5.1 miles of 36" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 150 MMcf/d additional capacity (EIA)[1]
  • up to 150,000 dekatherms per day[3]
Project type
Cost
  • $94.2 million (EIA estimate; no dollar year given)[1]
  • approximately $94 million[3]
In service

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Dominion Energy Transmission West Loop Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP19-26”. Federal Energy Regulatory Commission. 18 December 2018. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Dominion Energy Transmission, Inc., West Loop Project (CP19-26)”. FERC. 19 December 2019. Retrieved 4 October 2026.
  4. “Notice of In-Service, West Loop Project (CP19-26)”. Eastern Gas Transmission and Storage, Inc. (filed with FERC). 6 July 2021. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.