Dominion Hub I Project
From the ProvenHand pipeline wiki
Dominion Hub I Project is a natural gas pipeline expansion in Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2010. It runs 2 miles of 20" pipe.
| Dominion Hub I Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Pennsylvania[1] |
| Counties | Westmoreland[3] |
| Approved | 6 August 2008[3] |
| In service | 29 October 2010[1] |
| FERC docket | CP08-33[1] |
| Technical information | |
| Length | 2 mi[1] |
| Pipe size | 20"[1] |
| Capacity | 200 MMcf/d additional capacity (EIA)[1] |
| Horsepower added | 4,740 hp[3] |
| Cost | $34.4 million (EIA estimate; no dollar year given)[1][3] |
| On ProvenHand | |
| Hands listed | 0 |
Dominion Hub I Project is a natural gas pipeline expansion in Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2010. It runs 2 miles of 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Dominion Hub I Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP08-33”. Federal Energy Regulatory Commission. 10 December 2007. Retrieved 3 October 2026.
- “Order Issuing Certificate, Dominion Transmission, Inc., Dominion Hub I Project (CP08-33)”. FERC (order). 6 August 2008. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.