Dominion TL-263 Expansion Project is a natural gas pipeline expansion in West Virginia, operated by Dominion Transmission, Inc.. It entered service in 2008. It runs 6.4 miles of 12", 16" pipe.

Dominion TL-263 Expansion Project
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusIn service[1]
CommodityNatural gas[1]
Operator
Owner and operator
StateWest Virginia[1]
Approved6 June 2007[3]
In serviceNovember 2008[1]
FERC docketCP07-10[1]
Technical information
Length6.4 mi[1]
Pipe size12", 16"[1]
Capacity21.25 MMcf/d additional capacity (EIA)[1]
Cost$14.69 million (EIA estimate; no dollar year given)[1] or $13,324,686 total actual cost (cost completion report, 2015)[4][sources disagree]
On ProvenHand
Hands listed0

Dominion TL-263 Expansion Project is a natural gas pipeline expansion in West Virginia, operated by Dominion Transmission, Inc.. It entered service in 2008. It runs 6.4 miles of 12", 16" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $14.69 million (EIA estimate; no dollar year given)[1]
  • $13,324,686 total actual cost (cost completion report, 2015)[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Dominion TL-263 Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP07-10”. Federal Energy Regulatory Commission. 17 October 2006. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, Dominion Transmission, Inc. (CP07-10)”. Federal Energy Regulatory Commission. 6 June 2007. Retrieved 4 October 2026.
  4. “Supplemental Information - Cost Completion Report, TL-263 Expansion (CP07-10)”. Dominion Transmission, Inc. (filed with FERC). 20 March 2015. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.