Donegal New Drill 12653 Project is a facility project, operated by Columbia Gas Transmission, LLC. Construction began in 2025.
| Donegal New Drill 12653 Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Owner and operator | |
| Construction started | September 2025[2] |
| FERC docket | CP25-35[1] |
| On ProvenHand | |
| Hands listed | 0 |
Donegal New Drill 12653 Project is a facility project, operated by Columbia Gas Transmission, LLC. Construction began in 2025.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Donegal New Drill 12653 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP25-35”. Federal Energy Regulatory Commission. 17 December 2024. Retrieved 3 October 2026.
- “Construction Status Report No. 16 (09/15/2025 to 09/21/2025), Donegal New Drill 12653 Project (CP25-35)”. Columbia Gas Transmission, LLC (filed with FERC). 23 September 2025. Retrieved 3 October 2026.