Donegal New Drill 12653 Project

From the ProvenHand pipeline wiki

Donegal New Drill 12653 Project is a facility project, operated by Columbia Gas Transmission, LLC. Construction began in 2025.

Donegal New Drill 12653 Project
General information
KindFacility project[1]
Owner and operator
Construction startedSeptember 2025[2]
FERC docketCP25-35[1]
On ProvenHand
Hands listed0

Donegal New Drill 12653 Project is a facility project, operated by Columbia Gas Transmission, LLC. Construction began in 2025.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Donegal New Drill 12653 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-35”. Federal Energy Regulatory Commission. 17 December 2024. Retrieved 3 October 2026.
  2. “Construction Status Report No. 16 (09/15/2025 to 09/21/2025), Donegal New Drill 12653 Project (CP25-35)”. Columbia Gas Transmission, LLC (filed with FERC). 23 September 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.