Double E Pipeline Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Double E Pipeline Project is a natural gas pipeline in New Mexico and Texas, operated by Summit Permian Transmission, LLC.

Double E Pipeline Project
General information
KindPipeline project[1]
Project typeNew build[2]
StatusIn service[2][3]
CommodityNatural gas[2]
Owners and operators
Operator
StatesNew Mexico, Texas[2][4]
Approved15 October 2020[4]
In service17 November 2021[2] or 18 November 2021[3][sources disagree]
FERC docketCP19-495[4]
FERC pre-filing docketPF18-6[4]
Contractors
Technical information
Length132.9 mi[4] or 133.8 mi[2][sources disagree]
Pipe size30", 42"[2]
Capacity1350 MMcf/d (FERC project list)[2][4]
Cost$450 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Double E Pipeline Project is a natural gas pipeline in New Mexico and Texas, operated by Summit Permian Transmission, LLC.

Contractorsedit

ContractorWorkScope
Pumpco, Inc.[5]Primeproject page for the Double E Pipeline (client Double E Pipeline, LLC): 85 miles of 42-inch and 50 miles of 30-inch, Carlsbad NM to Coyanosa TX, year 2021, nine-month construction duration

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
In service
  • 17 November 2021[2]
  • 18 November 2021[3]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Double E Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP19-495”. Federal Energy Regulatory Commission. 31 July 2019. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notification of Project In-Service, Double E Pipeline Project (CP19-495)”. Double E Pipeline, LLC (filed with FERC). 30 November 2021. Retrieved 4 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “Double E Pipeline Project Details”. Pumpco, Inc. Archived from the original on 7 September 2024. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.