Dovre Lateral Natural Gas Pipeline
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Dovre Lateral Natural Gas Pipeline is a natural gas pipeline lateral in Wisconsin, operated by Wisconsin Gas Co. It runs 9.5 miles of 12" pipe.
| Dovre Lateral Natural Gas Pipeline | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Commodity | Natural gas[2] |
| Operator | |
| State | Wisconsin[1] |
| Counties | Barron[1] |
| Technical information | |
| Length | 9.5 mi[1] |
| Pipe size | 12 in[1] or 6 in[2][sources disagree] |
| Cost | $10.43 million (estimated cost of the new Dovre Lateral)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Dovre Lateral Natural Gas Pipeline is a natural gas pipeline lateral in Wisconsin, operated by Wisconsin Gas Co. It runs 9.5 miles of 12" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Dovre Lateral Natural Gas Pipeline? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Ongoing Projects: Construction Underway (Pipeline News, October 2018)”. Pipeline News. October 2018. Retrieved 3 October 2026.
- “Agricultural Impact Statement DATCP #4109, Dovre Lateral Natural Gas Pipeline, Barron County (PSC docket 6650-CG-252)”. Wisconsin Department of Agriculture, Trade and Consumer Protection. 18 October 2016. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.