Dowell Hill Replacement Project
From the ProvenHand pipeline wiki
Dowell Hill Replacement Project is a natural gas pipeline replacement in Indiana, operated by ANR Pipeline Company. It was built and entered service in 2024. It runs 1.4 miles of 30" pipe.
| Dowell Hill Replacement Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1] |
| Status | In service[2] |
| Commodity | Natural gas[3] |
| Owner and operator | |
| State | Indiana[3] |
| Counties | Bartholomew[3] |
| Construction started | March 2024[4] |
| In service | 25 November 2024[2] |
| FERC docket | CP24-24[1] |
| Technical information | |
| Length | 1.4 mi[3] |
| Pipe size | 30"[3] |
| Cost | $25,000,000 (cost stated in FERC staff EA)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Dowell Hill Replacement Project is a natural gas pipeline replacement in Indiana, operated by ANR Pipeline Company. It was built and entered service in 2024. It runs 1.4 miles of 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Dowell Hill Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP24-24”. Federal Energy Regulatory Commission. 12 December 2023. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 40 (December 8 to 14, 2024), Dowell Hill Replacement Project (CP24-24)”. ANR Pipeline Company (filed with FERC). 17 December 2024. Retrieved 3 October 2026.
- “Environmental Assessment Report, Dowell Hill Replacement Project (CP24-24)”. FERC. 16 February 2024. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 1 (March 10 to 16, 2024), Dowell Hill Replacement Project (CP24-24)”. ANR Pipeline Company (filed with FERC). 18 March 2024. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.