Downingtown Compressor Station Replacement

From the ProvenHand pipeline wiki

Downingtown Compressor Station Replacement is a pipeline replacement in Pennsylvania, operated by Columbia Gas Transmission, LLC.

Downingtown Compressor Station Replacement
General information
Project typeReplacement[1]
StatusApproved[2]
Owner and operator
StatePennsylvania[3]
CountiesChester[3]
FERC docketCP15-153[1]
Technical information
Cost$15.7 million[3]
On ProvenHand
Hands listed0

Downingtown Compressor Station Replacement is a pipeline replacement in Pennsylvania, operated by Columbia Gas Transmission, LLC.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Downingtown Compressor Station Replacement? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP15-153”. Federal Energy Regulatory Commission. 6 April 2015. Retrieved 3 October 2026.
  2. “Advance notification of natural gas facility replacement (Section 2.55(b)), Downingtown Compressor Station Replacement (CP15-153)”. Columbia Gas Transmission, LLC (filed with FERC). 6 April 2015. Retrieved 4 October 2026.
  3. “Environmental Assessment Report, Downingtown Compressor Station Replacement (CP15-153)”. FERC. 27 May 2015. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.