Dracut Expansion

From the ProvenHand pipeline wiki

Dracut Expansion is a pipeline project in Massachusetts, operated by Tennessee Gas Pipeline Company, L.L.C.. It runs 11.9 miles.

Dracut Expansion
General information
KindPipeline project[1]
Owner and operator
StateMassachusetts[1]
Approved20 November 2001[1]
FERC docketCP01-360[1]
Technical information
Length11.9 mi[1]
Capacity200 MMcf/d (FERC project list)[1]
On ProvenHand
Hands listed0

Dracut Expansion is a pipeline project in Massachusetts, operated by Tennessee Gas Pipeline Company, L.L.C.. It runs 11.9 miles.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Dracut Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.