Driftwood Line 200 and 300 Project Phase 3

From the ProvenHand pipeline wiki

Driftwood Line 200 and 300 Project Phase 3 is a natural gas pipeline in Louisiana, operated by Driftwood LNG Pipeline LLC. It runs 69.3 miles of 42" pipe.

Driftwood Line 200 and 300 Project Phase 3
General information
KindPipeline project[1]
Project typeNew build[1]
StatusApproved[1]
CommodityNatural gas[1]
Operator
StateLouisiana[1]
CountiesBeauregard, Calcasieu[2]
Approved21 April 2023[2]
FERC docketCP21-465[1]
Technical information
Length69.3 mi[1]
Pipe size42"[1]
Capacity1000 MMcf/d additional capacity (EIA)[1]
Cost$426 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Driftwood Line 200 and 300 Project Phase 3 is a natural gas pipeline in Louisiana, operated by Driftwood LNG Pipeline LLC. It runs 69.3 miles of 42" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Driftwood Line 200 and 300 Project Phase 3? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “Order Issuing Certificate, Driftwood Pipeline LLC, Line 200 and Line 300 Project (CP21-465), 183 FERC 61,049”. Federal Energy Regulatory Commission. 21 April 2023. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.