Driver to High Plains Lateral
From the ProvenHand pipeline wiki
Driver to High Plains Lateral is a pipeline lateral in Texas, operated by Gulf Coast Express Pipeline LLC. It runs 9 miles of 36" pipe.
| Driver to High Plains Lateral | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Operator | |
| State | Texas[1] |
| Contractors | |
| Technical information | |
| Length | 9 mi[1] |
| Pipe size | 36"[1] |
| On ProvenHand | |
| Hands listed | 0 |
Driver to High Plains Lateral is a pipeline lateral in Texas, operated by Gulf Coast Express Pipeline LLC. It runs 9 miles of 36" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Taylor Construction Co. Inc.[1] | Prime | Listed 2018-2019 as a pipeline construction contractor (with Taylor Construction, Pumpco and Strike) |
| Pumpco, Inc.[1] | Prime | Listed 2018-2019 as a pipeline construction contractor (with Taylor Construction, Pumpco and Strike) |
| Strike[1] | Prime | Listed 2018-2019 as a pipeline construction contractor (with Taylor Construction, Pumpco and Strike) |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Driver to High Plains Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.