Driver to High Plains Lateral

From the ProvenHand pipeline wiki

Driver to High Plains Lateral is a pipeline lateral in Texas, operated by Gulf Coast Express Pipeline LLC. It runs 9 miles of 36" pipe.

Driver to High Plains Lateral
General information
KindPipeline project[1]
Project typeLateral[1]
Operator
StateTexas[1]
Contractors
Technical information
Length9 mi[1]
Pipe size36"[1]
On ProvenHand
Hands listed0

Driver to High Plains Lateral is a pipeline lateral in Texas, operated by Gulf Coast Express Pipeline LLC. It runs 9 miles of 36" pipe.

Contractorsedit

ContractorWorkScope
Taylor Construction Co. Inc.[1]PrimeListed 2018-2019 as a pipeline construction contractor (with Taylor Construction, Pumpco and Strike)
Pumpco, Inc.[1]PrimeListed 2018-2019 as a pipeline construction contractor (with Taylor Construction, Pumpco and Strike)
Strike[1]PrimeListed 2018-2019 as a pipeline construction contractor (with Taylor Construction, Pumpco and Strike)

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Driver to High Plains Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Ongoing Projects: Construction Underway (Pipeline News, August 2019)”. Pipeline News. August 2019. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.