East Cheyenne Storage Header
From the ProvenHand pipeline wiki
East Cheyenne Storage Header is a natural gas pipeline in Colorado, operated by Merchant Energy Partners LLC. It entered service in 2012. It runs 3.5 miles of 16", 24" pipe.
| East Cheyenne Storage Header | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | New build[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| Facility projects | |
| State | Colorado[1] |
| Counties | Logan[6] |
| Approved | 2 August 2010[6] |
| In service | 30 March 2012[1] |
| FERC docket | CP10-34[1] |
| FERC pre-filing docket | PF09-12[2] |
| Contractors | |
| Technical information | |
| Length | 3.5 mi[1] |
| Pipe size | 16", 24"[1] |
| Capacity | 500 MMcf/d additional capacity (EIA)[1] |
| On ProvenHand | |
| Hands listed | 0 |
East Cheyenne Storage Header is a natural gas pipeline in Colorado, operated by Merchant Energy Partners LLC. It entered service in 2012. It runs 3.5 miles of 16", 24" pipe.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| ENGlobal Corporation[7] | engineering (front-end engineering and design, engineering and procurement services) | front-end engineering and design plus engineering and procurement for Phase One (compressor station, gas processing, gathering lines, interconnects, metering), selected by Merchant Energy Partners in May 2010 |
Inspection
| Firm | Scope |
|---|---|
| CH2M HILL, Inc.[6] | environmental consultant; submitted the project's 2010 wildlife surveys on behalf of East Cheyenne Gas Storage |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on East Cheyenne Storage Header? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP10-34”. Federal Energy Regulatory Commission. 18 December 2009. Retrieved 3 October 2026.
- “Order Amending Certificate, East Cheyenne Gas Storage, LLC (CP11-40)”. Federal Energy Regulatory Commission. 12 April 2011. Retrieved 4 October 2026.
- “Order Amending Certificate, East Cheyenne Gas Storage, LLC (CP14-486)”. Federal Energy Regulatory Commission. 14 August 2014. Retrieved 4 October 2026.
- “FERC eLibrary filing 20120726-3021”. Federal Energy Regulatory Commission. Retrieved 4 October 2026.
- “Biweekly Status Report, August 21 - September 3, 2010, East Cheyenne Gas Storage Project (CP10-34)”. East Cheyenne Gas Storage, LLC (filed with FERC). 3 September 2010. Retrieved 4 October 2026.
- “ENGlobal Announces Gas Storage Contract Award (press release, Exhibit 99.1 to Form 8-K)”. ENGlobal Corporation (SEC filing). 19 May 2010. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.