East Side Expansion Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
East Side Expansion Project is a natural gas pipeline expansion, operated by Columbia Gas Transmission, LLC. Construction began in 2015. It runs 19 miles of 26" pipe.
| East Side Expansion Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1][2] |
| Status | In service[1][3] |
| Commodity | Natural gas[1][4] |
| Operator | |
| Owner and operator | |
| Facility projects | |
| States | NJ, NY, PA[1][4] or MD, NJ, NY, PA[5][sources disagree] |
| Counties | New Jersey: Gloucester Pennsylvania: Chester, Pike[6] |
| Approved | 18 December 2014[4][5] |
| Construction started | 2015[7] |
| In service | 30 September 2015[1] or 2 October 2015[6][sources disagree] |
| FERC docket | CP14-17[1] |
| FERC pre-filing docket | PF13-7[1] |
| Technical information | |
| Length | 19 mi[1][5] |
| Pipe size | 26"[4] |
| Capacity | 312 MMcf/d additional capacity (EIA)[1][5] |
| Capacity added | an additional 312,000 Dth per day of firm transportation service[4] |
| Cost | $269 million (EIA estimate; no dollar year given)[1] or estimated total capital cost of $268,495,000[4][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
East Side Expansion Project is a natural gas pipeline expansion, operated by Columbia Gas Transmission, LLC. Construction began in 2015. It runs 19 miles of 26" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on East Side Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP14-17”. Federal Energy Regulatory Commission. 1 November 2013. Retrieved 3 October 2026.
- “Letter order granting Columbia Gas Transmission, LLC's request to place into service the facilities associated with the Easton Compressor Station, East Side Expansion Project (CP14-17)”. FERC. 30 October 2015. Retrieved 4 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Columbia Gas Transmission, LLC, East Side Expansion Project (CP14-17)”. FERC. 18 December 2014. Retrieved 4 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Columbia Pipeline Group's East Side Expansion Project Placed In Service”. Columbia Pipeline Group, Inc. (PR Newswire release). 2 October 2015. Retrieved 3 October 2026.
- “Columbia's ESE project placed in service”. World Pipelines. 5 October 2015. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.