East TX/North LA Exp Loop/MS Exp

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

East TX/North LA Exp Loop/MS Exp is a natural gas pipeline expansion in Louisiana, Mississippi and Texas, operated by Gulf South Pipeline Company, LLC. It entered service in 2008.

East TX/North LA Exp Loop/MS Exp
Also calledGS Texas to Mississippi Expansion[1], East Texas to Mississippi Expansion Project[2]
General information
KindPipeline project[1]
Project typeExpansion[2][3]
StatusIn service[3][4]
CommodityNatural gas[3]
Owner and operator
StatesLouisiana, Mississippi, Texas[1][3]
Approved18 June 2007[1][5]
In service2 June 2008[3]
FERC docketCP06-446[1]
FERC pre-filing docketPF06-17[1]
Contractors
Technical information
Length241.9 mi[1] or 243 mi[3][sources disagree]
Pipe size36", 42"[3]
Capacity1700 MMcf/d (FERC project list)[1][3]
Cost$961 million (EIA estimate; no dollar year given)[3]
On ProvenHand
Hands listed0

East TX/North LA Exp Loop/MS Exp is a natural gas pipeline expansion in Louisiana, Mississippi and Texas, operated by Gulf South Pipeline Company, LLC. It entered service in 2008.

Contractorsedit

ContractorWorkScopeSpreadYears
Associated Pipe Line Contractors, Inc.[6]PrimeSpread 3 (location given as Rayville, LA): about 58 miles of 42-inch pipelineSpread 31 August 2007 – 1 December 2007

Spreads

SpreadPrime contractor
Spread 3[6]Associated Pipe Line Contractors, Inc.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on East TX/North LA Exp Loop/MS Exp? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “FERC eLibrary docket CP06-446”. Federal Energy Regulatory Commission. 1 September 2006. Retrieved 3 October 2026.
  3. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  4. “East Texas to Mississippi Expansion Project In Service Notification (CP06-446), eLibrary filing description (scanned file, no text)”. Gulf South Pipeline Company, LP (filed with FERC). 7 January 2008. Retrieved 4 October 2026.
  5. “Order Issuing Certificates and Granting Abandonment, Gulf South Pipeline Company, LP (CP06-446 et al.)”. FERC. 18 June 2007. Retrieved 4 October 2026.
  6. “Major pipeline projects executed by Associated Pipe Line Contractors, Inc. (Wayback capture 2009-05-02)”. Associated Pipe Line Contractors, Inc. Archived from the original on 2 May 2009. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.