Eastern Gas Transmission and Storage LN-24 Pipeline Project
From the ProvenHand pipeline wiki
Eastern Gas Transmission and Storage LN-24 Pipeline Project is a natural gas pipeline replacement, operated by Eastern Gas Transmission and Storage, Inc.. It runs 3.8 miles of 20" pipe.
| Eastern Gas Transmission and Storage LN-24 Pipeline Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Replacement[1][2] |
| Status | Approved[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Counties | Allegany, Wyoming[2] |
| FERC docket | CP26-69[1] |
| Technical information | |
| Length | 3.8 mi[2] |
| Pipe size | 20"[2] |
| Cost | $26,900,000[2] |
| On ProvenHand | |
| Hands listed | 0 |
Eastern Gas Transmission and Storage LN-24 Pipeline Project is a natural gas pipeline replacement, operated by Eastern Gas Transmission and Storage, Inc.. It runs 3.8 miles of 20" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Eastern Gas Transmission and Storage LN-24 Pipeline Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP26-69”. Federal Energy Regulatory Commission. 16 January 2026. Retrieved 3 October 2026.
- “Environmental Assessment Report for Eastern Gas Transmission and Storage, Inc.'s Section 2.55(b)(3) Advance Notification of Replacement of Facilities under CP26-69.”. Federal Energy Regulatory Commission (staff document). 10 February 2026. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.