EastLeg Project is a natural gas pipeline lateral in Wisconsin, operated by ANR Pipeline Company. It entered service in 2005. It runs 8.2 miles of 8", 30" pipe.
| EastLeg Project | |
|---|---|
| Also called | ANR EastLeg Expansion[1] |
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Wisconsin[1][2] |
| Approved | 12 July 2004[1] |
| In service | November 2005[2] |
| FERC docket | CP04-51[1] |
| Technical information | |
| Length | 8.2 mi[1][2] |
| Pipe size | 8", 30"[2] |
| Capacity | 143.4 MMcf/d (FERC project list)[1][2] |
| Cost | $18.6 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
EastLeg Project is a natural gas pipeline lateral in Wisconsin, operated by ANR Pipeline Company. It entered service in 2005. It runs 8.2 miles of 8", 30" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on EastLeg Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.