Echo Springs Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Echo Springs Project is a natural gas pipeline lateral in Wyoming, operated by Wyoming Interstate Company, L.L.C.. It entered service in 2004.

Echo Springs Project
Also calledWIG Echo Springs Lateral[1]
General information
KindPipeline project[1]
Project typeLateral[2]
StatusIn service[2]
CommodityNatural gas[2]
Owner and operator
StateWyoming[1][2]
Approved11 May 2004[1]
In serviceNovember 2004[2]
FERC docketCP04-90[1]
Technical information
Length5.3 mi[1] or 5.2 mi[2][sources disagree]
Pipe size16"[2]
Capacity116 MMcf/d (FERC project list)[1] or 110 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$11.56 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Echo Springs Project is a natural gas pipeline lateral in Wyoming, operated by Wyoming Interstate Company, L.L.C.. It entered service in 2004.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 116 MMcf/d (FERC project list)[1]
  • 110 MMcf/d additional capacity (EIA)[2]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Echo Springs Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.