Edgemoor Compressor Station
From the ProvenHand pipeline wiki
Edgemoor Compressor Station is a natural gas pipeline expansion in South Carolina, operated by Carolina Gas Transmission, LLC. It entered service in 2015. It runs 0.2 miles.
| Edgemoor Compressor Station | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| Operator | |
| State | South Carolina[1][2] |
| Counties | Chester[3] |
| Approved | 19 February 2015[1] |
| In service | December 2015[2] |
| FERC docket | CP14-97[1] |
| Technical information | |
| Length | 0.2 mi[1] |
| Capacity | 45 MMcf/d (FERC project list)[1][2] |
| Capacity added | about 45,000 dekatherms of natural gas per day to two local distribution customers[3] |
| Horsepower added | 9,500 hp[3] |
| Cost | $35 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Edgemoor Compressor Station is a natural gas pipeline expansion in South Carolina, operated by Carolina Gas Transmission, LLC. It entered service in 2015. It runs 0.2 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Edgemoor Compressor Station? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Environmental Assessment, Edgemoor Compressor Station Project (CP14-97)”. Federal Energy Regulatory Commission. 14 October 2014. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.