Egan Storage Header Exp
From the ProvenHand pipeline wiki
Egan Storage Header Exp is a natural gas pipeline lateral in Louisiana, operated by Spectra Energy. It entered service in 2010. It runs 16.5 miles of 24" pipe.
| Egan Storage Header Exp | |
|---|---|
| Also called | Egan Fourth Cavern Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Lateral[2] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Operator | |
| Owner and operator | |
| State | Louisiana[2] |
| Approved | 18 October 2007[3] |
| In service | September 2010[2] |
| FERC docket | CP07-88[2] |
| Contractors | |
| Technical information | |
| Length | 16.5 mi[2] |
| Pipe size | 24"[2] |
| Capacity | 200 MMcf/d additional capacity (EIA)[2] |
| Cost | $25 million (EIA estimate; no dollar year given)[2] |
| On ProvenHand | |
| Hands listed | 0 |
Egan Storage Header Exp is a natural gas pipeline lateral in Louisiana, operated by Spectra Energy. It entered service in 2010. It runs 16.5 miles of 24" pipe.
Contractorsedit
| Contractor | Work | Prime or sub | Scope |
|---|---|---|---|
| Sprint Pipeline Services, L.P.[4] | storage facility piping | Gas piping for the fourth storage cavern and the dehydration addition at the Egan storage site | |
| Ardent Services[4] | storage facility piping | Under Sprint Pipeline Services, L.P. | Subcontractor to Sprint Pipeline Services on the fourth-cavern gas piping |
| Lonquist Field Service[4] | cavern testing support | Frac tanks and brine fill for the fourth cavern's mechanical integrity test and sonar | |
| Express Energy Services[4] | cavern testing support | Under Lonquist Field Service | Subcontractor to Lonquist Field Service on cavern test preparation |
| Baker Corp[4] | cavern testing support | Named on site with Lonquist Field Service for frac tank installation and brine fill before the cavern test | |
| Gottson Construction[4] | cavern testing support | Named on site with Lonquist Field Service for frac tank installation and brine fill before the cavern test | |
| Bolttech[4] | cavern testing support | Named on site with Lonquist Field Service for frac tank installation and brine fill before the cavern test |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Egan Storage Header Exp? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP07-88”. Federal Energy Regulatory Commission. 20 February 2007. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Order Issuing Certificate, Egan Hub Storage, LLC (CP07-88)”. Federal Energy Regulatory Commission. 18 October 2007. Retrieved 4 October 2026.
- “Weekly Environmental Compliance Report, Egan Fourth Cavern Project, July 27 - Aug 2, 2009 (CP07-88)”. Egan Hub Storage, LLC (filed with FERC). 7 August 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.