El Dorado Interconnect Project
From the ProvenHand pipeline wiki
El Dorado Interconnect Project is a natural gas pipeline in Arkansas, operated by Trans-Union Interstate Pipeline, L.P.. It entered service in 2016.
| El Dorado Interconnect Project | |
|---|---|
| Also called | Trans-Union Interconnect and Metering Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Status | In service[3] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| State | Arkansas[2] |
| Counties | Union[2] |
| Approved | 18 September 2015[3] |
| In service | March 2016[3] |
| FERC docket | CP15-530[4] |
| Technical information | |
| Capacity added | 30,000 MMBtu/day[2] |
| Cost | $610,266[2] |
| On ProvenHand | |
| Hands listed | 0 |
El Dorado Interconnect Project is a natural gas pipeline in Arkansas, operated by Trans-Union Interstate Pipeline, L.P.. It entered service in 2016.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on El Dorado Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Environmental Assessment Report, Trans-Union Interconnect and Metering Project (CP15-530)”. FERC. 17 September 2015. Retrieved 4 October 2026.
- “Prior notice request, El Dorado Interconnect Project, Trans-Union Interstate Pipeline, L.P. (CP15-530)”. Trans-Union Interstate Pipeline, L.P. (filed with FERC). 10 July 2015. Retrieved 4 October 2026.
- “Notice of bypass, Trans-Union Interstate Pipeline, L.P. (CP15-530)”. Trans-Union Interstate Pipeline, L.P. (filed with FERC). 28 April 2016. Retrieved 4 October 2026.
- “FERC eLibrary docket CP15-530”. Federal Energy Regulatory Commission. 10 July 2015. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.