El Paso Ductos De Nogales Project
From the ProvenHand pipeline wiki
El Paso Ductos De Nogales Project is a natural gas pipeline lateral in Arizona. It entered service in 2002. It runs 1 miles of 6", 16" pipe.
| El Paso Ductos De Nogales Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Lateral[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| State | Arizona[1] |
| In service | 26 February 2002[1] |
| FERC docket | CP01-41[1] |
| Technical information | |
| Length | 1 mi[1] |
| Pipe size | 6", 16"[1] |
| Capacity | 8.5 MMcf/d additional capacity (EIA)[1] |
| Cost | $0.42 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
El Paso Ductos De Nogales Project is a natural gas pipeline lateral in Arizona. It entered service in 2002. It runs 1 miles of 6", 16" pipe.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on El Paso Ductos De Nogales Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.