El Paso Hobbs Lateral

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

El Paso Hobbs Lateral is a natural gas pipeline lateral, operated by El Paso Natural Gas Company, L.L.C.. It was built and entered service in 2008. It runs 7.3 miles of 20" pipe.

El Paso Hobbs Lateral
Also calledHobbs Expansion Project[1]
General information
KindPipeline project[2]
Project typeLateral[2]
StatusIn service[2][3]
CommodityNatural gas[2]
Operator
Owner and operator
StateTX[2] or NM[4][sources disagree]
CountiesLea[4]
Approved30 April 2008[5]
Construction started17 September 2008[4]
In service26 November 2008[2][3]
FERC docketCP08-14[2]
Technical information
Length7.3 mi[2]
Pipe size20"[2]
Capacity150 MMcf/d additional capacity (EIA)[2]
Cost$16.9 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

El Paso Hobbs Lateral is a natural gas pipeline lateral, operated by El Paso Natural Gas Company, L.L.C.. It was built and entered service in 2008. It runs 7.3 miles of 20" pipe.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on El Paso Hobbs Lateral? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP08-14”. Federal Energy Regulatory Commission. 1 November 2007. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Notice of Commencement of Service, Hobbs Expansion Project (CP08-14)”. El Paso Natural Gas Company (filed with FERC). 3 December 2008. Retrieved 4 October 2026.
  4. “Hobbs Expansion Project Bi-Weekly Construction Status Report No. 1 (CP08-14)”. El Paso Natural Gas Company (filed with FERC). 15 October 2008. Retrieved 4 October 2026.
  5. “Order issuing certificate and authorizing abandonment re El Paso Natural Gas Company (CP08-14), eLibrary filing description”. FERC. 30 April 2008. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.