El Paso Natural Gas Line No. 1903 Project is a natural gas pipeline conversion in Arizona and California, operated by El Paso Natural Gas Company, L.L.C.. It entered service in 2005.

El Paso Natural Gas Line No. 1903 Project
Also calledEl Paso Line 1903 Conversion[1]
General information
KindPipeline project[2]
Project typeConversion[1][3][4]
StatusIn service[1]
CommodityNatural gas[1]
Owner and operator
StatesArizona, California[1][2]
Approved16 June 2005[2][3]
In service30 December 2005[1]
FERC docketCP05-2[2]
Technical information
Length6.4 mi[2] or 94.4 mi[1][sources disagree]
Pipe size30"[1]
Capacity502 MMcf/d (FERC project list)[1][2]
Cost$78 million (EIA estimate; no dollar year given)[1] or approximately $73.6 million[3][sources disagree]
On ProvenHand
Hands listed0

El Paso Natural Gas Line No. 1903 Project is a natural gas pipeline conversion in Arizona and California, operated by El Paso Natural Gas Company, L.L.C.. It entered service in 2005.

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $78 million (EIA estimate; no dollar year given)[1]
  • approximately $73.6 million[3]
Length

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on El Paso Natural Gas Line No. 1903 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  3. “Order Issuing Certificate, El Paso Natural Gas Company, Line No. 1903 Project (CP05-2)”. FERC. 16 June 2005. Retrieved 3 October 2026.
  4. “FERC eLibrary docket CP05-2”. Federal Energy Regulatory Commission. 3 June 2004. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.