El Paso Natural Gas South Mainline Expansion Project
From the ProvenHand pipeline wiki
El Paso Natural Gas South Mainline Expansion Project is a natural gas pipeline expansion, operated by El Paso Natural Gas Company, L.L.C.. It entered service in 2020. It runs 17 miles of 30" pipe.
| El Paso Natural Gas South Mainline Expansion Project | |
|---|---|
| Also called | South Mainline Expansion Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Expansion[1][3] |
| Status | In service[1][4] |
| Commodity | Natural gas[1][5] |
| Owner and operator | |
| Facility projects | |
| States | AZ, NM, TX[2][5] or AZ, CA, NM, TX[1][sources disagree] |
| Counties | Arizona: Cochise New Mexico: Luna Texas: El Paso[5] |
| Approved | 22 November 2019[2] or 21 November 2019[5][sources disagree] |
| In service | 2 July 2020[1][4] |
| FERC docket | CP18-332[2] |
| Technical information | |
| Length | 17 mi[1][2][5] |
| Pipe size | 30"[1][5] |
| Capacity | 321 MMcf/d (FERC project list)[1][2] |
| Capacity added | an additional 182,085 Dth per day of firm expansion transportation service[5] |
| Cost | $122 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
El Paso Natural Gas South Mainline Expansion Project is a natural gas pipeline expansion, operated by El Paso Natural Gas Company, L.L.C.. It entered service in 2020. It runs 17 miles of 30" pipe.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Approved | |
| States |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on El Paso Natural Gas South Mainline Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “FERC eLibrary docket CP18-332”. Federal Energy Regulatory Commission. 26 April 2018. Retrieved 3 October 2026.
- “Letter order granting El Paso Natural Gas Company LLC's 06/17/2020 request to place into service the South Mainline Expansion Project (CP18-332)”. FERC. 1 July 2020. Retrieved 4 October 2026.
- “Order Issuing Certificate, El Paso Natural Gas Company, L.L.C., South Mainline Expansion Project (CP18-332)”. FERC. 21 November 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.