El Paso Picacho Compressor Station Project
From the ProvenHand pipeline wiki
El Paso Picacho Compressor Station Project is a natural gas pipeline expansion in Arizona, operated by El Paso Natural Gas Company, L.L.C.. Construction began in 2008.
| El Paso Picacho Compressor Station Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| Operator | |
| Owner and operator | |
| State | Arizona[1] |
| Counties | Pinal[3] |
| Approved | 15 February 2008[3] |
| Construction started | 15 April 2008[4] |
| In service | December 2008[1] or 6 November 2008[3][sources disagree] |
| FERC docket | CP07-448[1] |
| Technical information | |
| Capacity | 30 MMcf/d additional capacity (EIA)[1] |
| Cost | $23.9 million (EIA estimate; no dollar year given)[1] or $29,157,293 total actual project cost (estimate $23,899,700)[5][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
El Paso Picacho Compressor Station Project is a natural gas pipeline expansion in Arizona, operated by El Paso Natural Gas Company, L.L.C.. Construction began in 2008.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Cost | |
| In service |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on El Paso Picacho Compressor Station Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “FERC eLibrary docket CP07-448”. Federal Energy Regulatory Commission. 18 September 2007. Retrieved 3 October 2026.
- “Notice of In-Service, Picacho Compressor Station Project (CP07-448)”. El Paso Natural Gas Company (filed with FERC). 26 November 2008. Retrieved 4 October 2026.
- “Notice of Commencement of Construction, Picacho Compressor Station Project (CP07-448)”. El Paso Natural Gas Company (filed with FERC). 29 April 2008. Retrieved 4 October 2026.
- “Actual cost of facilities constructed, Picacho Compressor Station Project (CP07-448)”. El Paso Natural Gas Company (filed with FERC). 29 April 2009. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.