El Paso Power-Up Expansion III
From the ProvenHand pipeline wiki
El Paso Power-Up Expansion III is a natural gas pipeline expansion in Arizona, California, New Mexico and Texas. It entered service in 2004.
| El Paso Power-Up Expansion III | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| States | Arizona, California, New Mexico, Texas[1] |
| In service | May 2004[1] |
| FERC docket | CP03-1[1] |
| Technical information | |
| Pipe size | 30"[1] |
| Capacity | 100 MMcf/d additional capacity (EIA)[1] |
| Cost | $63 million (EIA estimate; no dollar year given)[1] |
| On ProvenHand | |
| Hands listed | 0 |
El Paso Power-Up Expansion III is a natural gas pipeline expansion in Arizona, California, New Mexico and Texas. It entered service in 2004.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on El Paso Power-Up Expansion III? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.