El Paso Samalayuca Expansion
From the ProvenHand pipeline wiki
El Paso Samalayuca Expansion is a natural gas pipeline expansion in Texas. It entered service in 2002.
| El Paso Samalayuca Expansion | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Project type | Expansion[1] |
| Status | In service[1] |
| Commodity | Natural gas[1] |
| State | Texas[1] |
| In service | June 2002[1] |
| FERC docket | CP93-253[1] |
| Technical information | |
| Pipe size | 24"[1] |
| Capacity | 100 MMcf/d additional capacity (EIA)[1] |
| On ProvenHand | |
| Hands listed | 0 |
El Paso Samalayuca Expansion is a natural gas pipeline expansion in Texas. It entered service in 2002.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on El Paso Samalayuca Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.