Elba Express Bridge Project (EEBP)

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Elba Express Bridge Project (EEBP) is a natural gas pipeline expansion in Georgia and South Carolina, operated by Elba Express Company, L.L.C.. It runs 71 miles of 30" pipe.

Elba Express Bridge Project (EEBP)
Also calledBridge Project[1]
General information
KindPipeline project[2]
Project typeExpansion[2]
StatusProposed[2]
CommodityNatural gas[2]
Operator
StatesGeorgia, South Carolina[2]
CountiesGeorgia: Screven
South Carolina: Colleton, Hampton
[1]
FERC pre-filing docketPF27-1[1]
Contractors
Technical information
Length71 mi[1][2][3]
Pipe size30"[1][2]
Capacity325 MMcf/d additional capacity (EIA)[2][3] or up to approximately 325,000 Dth/d of firm transportation capacity[1][sources disagree]
Cost$431 million (EIA estimate; no dollar year given)[2] or $430 million approx. capital, Kinder Morgan share (FY2025 Form 10-K)[3][sources disagree]
On ProvenHand
Hands listed0

Elba Express Bridge Project (EEBP) is a natural gas pipeline expansion in Georgia and South Carolina, operated by Elba Express Company, L.L.C.. It runs 71 miles of 30" pipe.

Contractorsedit

ContractorWorkScope
TRC Environmental Corporation[1]Environmental consultant (surveys and permitting)Environmental and cultural surveys, Environmental Report, permit applications and species consultations for the pre-filing and certificate stages
Pinnacle Resources Group[1]Right-of-way servicesLand ownership research, survey notifications and right-of-way acquisition
Gonzalez-Strength & Associates, Inc.[1]SurveyCivil surveys for the project (pre-construction)
Farnsworth Group Inc.[1]Engineering servicesEngineering services for the project (pre-construction)

Crossings

FeatureMethod
Coosawhatchie River[1]HDD
Little Salkehatchie River[1]HDD
Salkehatchie River[1]HDD
Savannah River[1]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 325 MMcf/d additional capacity (EIA)[2][3]
  • up to approximately 325,000 Dth/d of firm transportation capacity[1]
Cost
  • $431 million (EIA estimate; no dollar year given)[2]
  • $430 million approx. capital, Kinder Morgan share (FY2025 Form 10-K)[3]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Elba Express Bridge Project (EEBP)? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Request to Use Pre-filing Procedures, Bridge Project (PF27-1), with Appendices A-F”. Elba Express Company, L.L.C. (filed with FERC). 2 October 2026. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Kinder Morgan, Inc. Form 10-K for fiscal year 2025 (major projects table)”. Kinder Morgan, Inc. 13 February 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.