Elba Express Southern System Expansion 4 Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

Elba Express Southern System Expansion 4 Project is a natural gas pipeline expansion, operated by Elba Express Company, L.L.C..

Elba Express Southern System Expansion 4 Project
Also calledSouth System Expansion 4 Project[1], System Expansion 4 (SSE4) Project[1]
General information
KindPipeline project[1]
Project typeExpansion[1][2]
StatusApproved[2][3]
CommodityNatural gas[2]
Owners and operators
Operator
StatesAL, GA, MS[4][5] or AL, GA, MS, SC[2][sources disagree]
Approved31 July 2026[3][4]
FERC docketCP25-517[1]
FERC pre-filing docketPF25-1[1]
Technical information
Length291.3 mi[4] or 291 mi[2][3][5][sources disagree]
Pipe size20", 42"[3]
Capacity1783.39 MMcf/d (FERC project list)[4] or 132.3 MMcf/d (FERC project list)[5] or 1323 MMcf/d additional capacity (EIA)[2][sources disagree]
Cost$3500 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Elba Express Southern System Expansion 4 Project is a natural gas pipeline expansion, operated by Elba Express Company, L.L.C..

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Capacity
  • 1783.39 MMcf/d (FERC project list)[4]
  • 132.3 MMcf/d (FERC project list)[5]
  • 1323 MMcf/d additional capacity (EIA)[2]
Length
States

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Elba Express Southern System Expansion 4 Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP25-517”. Federal Energy Regulatory Commission. 30 June 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Order Issuing Certificates and Approving Abandonment, Mississippi Crossing Project and South System Expansion 4 Project (CP25-514, CP25-517)”. Federal Energy Regulatory Commission. 31 July 2026. Retrieved 4 October 2026.
  4. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  5. “FERC: Major Pipeline Projects Pending (Onshore)”. Federal Energy Regulatory Commission. Archived from the original on 20 December 2025. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.