Elba III Expansion is a natural gas facility project at Elba Island LNG in Georgia, operated by Southern LNG, Inc.. Construction began in 2007 and the facility entered service in 2010.

Elba III Expansion
General information
KindFacility project[1]
Project typeAdded units[1]
StatusIn service[2]
CommodityNatural gas[1]
Owner and operator
FacilityElba Island LNG[1]
StateGeorgia[1]
CountiesChatham[1]
Approved20 September 2007[1]
Construction started15 October 2007[3]
In service1 March 2010[2][4]
FERC docketCP06-470[1]
Contractors
Technical information
Capacity addedvaporization capacity by 900 MMcf per day in two phases (Phase A 405 MMcf per day, Phase B 495 MMcf per day)[1]
Units added1 × LNG storage tank, 200,000 cubic meters, 4.22 Bcf (Phase A); 1 × LNG storage tank, 200,000 cubic meters, 4.22 Bcf (Phase B)[1]
On ProvenHand
Hands listed0

Elba III Expansion is a natural gas facility project at Elba Island LNG in Georgia, operated by Southern LNG, Inc.. Construction began in 2007 and the facility entered service in 2010.

Contractorsedit

ContractorWorkScope
Chicago Bridge and Iron[5][6][7]Prime
TIC – The Industrial Company[5][8]slip modification (marine construction) contractor
Tricor Construction, Inc.[9]MSE spill-containment walls around the LNG storage tank
Menard Group USA[9]site ground improvement
Thomas and Hutton[3]slip modification design drawings (engineering)
Harbor and Marine Engineering[8]Fabricationmooring dolphin hooks and docking hardware for the slip

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Elba III Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Order Issuing Certificates, Authorizing Abandonments, Granting Authorization, and Denying Rehearing, Southern LNG, Inc. et al. (CP06-470 et al.)”. FERC. 20 September 2007. Retrieved 4 October 2026.
  2. “Notice of Commencement of Service for Phase A Vaporization Capacity, Elba III Expansion Project (CP06-470)”. Southern LNG Inc. (filed with FERC). 4 March 2010. Retrieved 4 October 2026.
  3. “Monthly Construction Progress Report, October 15 - November 14, 2007, Elba III Terminal Expansion Project (CP06-470)”. Southern LNG, Inc. (filed with FERC). 15 November 2007. Retrieved 4 October 2026.
  4. “El Paso Pipeline Partners, L.P. Form 10-Q for the quarter ended March 31, 2010”. El Paso Pipeline Partners, L.P. (SEC filing). 10 May 2010. Retrieved 4 October 2026.
  5. “Monthly Construction Progress Report, April 15 - May 14, 2009, Elba III Terminal Expansion Project (CP06-470)”. Southern LNG, Inc. (filed with FERC). 15 May 2009. Retrieved 4 October 2026.
  6. “Southern LNG Awards Contract, Prepares to Expand Terminal in Georgia”. Industrial Info Resources. 10 October 2007. Retrieved 4 October 2026.
  7. “Elba Island LNG Terminal”. Offshore Technology. 1 December 2010. Retrieved 4 October 2026.
  8. “Monthly Construction Progress Report, December 15, 2007 - January 14, 2008, Elba III Terminal Expansion Project (CP06-470)”. Southern LNG, Inc. (filed with FERC). 15 January 2008. Retrieved 4 October 2026.
  9. “Elba Island LNG Terminal Expansion (project page, archived 2021-01-25)”. The Reinforced Earth Company. Archived from the original on 25 January 2021. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.