Elba III Expansion
From the ProvenHand pipeline wiki
Elba III Expansion is a natural gas facility project at Elba Island LNG in Georgia, operated by Southern LNG, Inc.. Construction began in 2007 and the facility entered service in 2010.
| Elba III Expansion | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Project type | Added units[1] |
| Status | In service[2] |
| Commodity | Natural gas[1] |
| Owner and operator | |
| Facility | Elba Island LNG[1] |
| State | Georgia[1] |
| Counties | Chatham[1] |
| Approved | 20 September 2007[1] |
| Construction started | 15 October 2007[3] |
| In service | 1 March 2010[2][4] |
| FERC docket | CP06-470[1] |
| Contractors | |
| Technical information | |
| Capacity added | vaporization capacity by 900 MMcf per day in two phases (Phase A 405 MMcf per day, Phase B 495 MMcf per day)[1] |
| Units added | 1 × LNG storage tank, 200,000 cubic meters, 4.22 Bcf (Phase A); 1 × LNG storage tank, 200,000 cubic meters, 4.22 Bcf (Phase B)[1] |
| On ProvenHand | |
| Hands listed | 0 |
Elba III Expansion is a natural gas facility project at Elba Island LNG in Georgia, operated by Southern LNG, Inc.. Construction began in 2007 and the facility entered service in 2010.
Contractorsedit
| Contractor | Work | Scope |
|---|---|---|
| Chicago Bridge and Iron[5][6][7] | Prime | |
| TIC – The Industrial Company[5][8] | slip modification (marine construction) contractor | |
| Tricor Construction, Inc.[9] | MSE spill-containment walls around the LNG storage tank | |
| Menard Group USA[9] | site ground improvement | |
| Thomas and Hutton[3] | slip modification design drawings (engineering) | |
| Harbor and Marine Engineering[8] | Fabrication | mooring dolphin hooks and docking hardware for the slip |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Elba III Expansion? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Order Issuing Certificates, Authorizing Abandonments, Granting Authorization, and Denying Rehearing, Southern LNG, Inc. et al. (CP06-470 et al.)”. FERC. 20 September 2007. Retrieved 4 October 2026.
- “Notice of Commencement of Service for Phase A Vaporization Capacity, Elba III Expansion Project (CP06-470)”. Southern LNG Inc. (filed with FERC). 4 March 2010. Retrieved 4 October 2026.
- “Monthly Construction Progress Report, October 15 - November 14, 2007, Elba III Terminal Expansion Project (CP06-470)”. Southern LNG, Inc. (filed with FERC). 15 November 2007. Retrieved 4 October 2026.
- “El Paso Pipeline Partners, L.P. Form 10-Q for the quarter ended March 31, 2010”. El Paso Pipeline Partners, L.P. (SEC filing). 10 May 2010. Retrieved 4 October 2026.
- “Monthly Construction Progress Report, April 15 - May 14, 2009, Elba III Terminal Expansion Project (CP06-470)”. Southern LNG, Inc. (filed with FERC). 15 May 2009. Retrieved 4 October 2026.
- “Southern LNG Awards Contract, Prepares to Expand Terminal in Georgia”. Industrial Info Resources. 10 October 2007. Retrieved 4 October 2026.
- “Elba Island LNG Terminal”. Offshore Technology. 1 December 2010. Retrieved 4 October 2026.
- “Monthly Construction Progress Report, December 15, 2007 - January 14, 2008, Elba III Terminal Expansion Project (CP06-470)”. Southern LNG, Inc. (filed with FERC). 15 January 2008. Retrieved 4 October 2026.
- “Elba Island LNG Terminal Expansion (project page, archived 2021-01-25)”. The Reinforced Earth Company. Archived from the original on 25 January 2021. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.