Elk Basin-Billings Line Replacement Project

From the ProvenHand pipeline wiki

Elk Basin-Billings Line Replacement Project is a pipeline project in Montana, operated by Williston Basin Interstate Pipeline Company. It runs 9.5 miles of 12" pipe.

Elk Basin-Billings Line Replacement Project
General information
KindPipeline project[1]
StatusIn service[2]
Owner and operator
StateMontana[4]
CountiesCarbon[4]
FERC docketCP11-522[3]
Technical information
Length9.5 mi[4]
Pipe size12"[4]
Cost$4,722,550[4]
On ProvenHand
Hands listed0

Elk Basin-Billings Line Replacement Project is a pipeline project in Montana, operated by Williston Basin Interstate Pipeline Company. It runs 9.5 miles of 12" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Elk Basin-Billings Line Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Construction inspection report for WBI Energy Transmission, Inc’s Elk Basin-Billings Line Replacement Project (CP11-522)”. Federal Energy Regulatory Commission (Office of Energy Projects). 23 July 2013. Retrieved 3 October 2026.
  2. “Weekly Construction Progress Report No. 15, final report, Billings Line Replacement (CP11-522)”. Williston Basin Interstate Pipeline Company (filed with FERC). 31 January 2012. Retrieved 3 October 2026.
  3. “FERC eLibrary docket CP11-522”. Federal Energy Regulatory Commission. 26 July 2011. Retrieved 3 October 2026.
  4. “Environmental Assessment Report, Williston Basin Section 157.210 blanket-type replacement, Line Section 22 (CP11-522)”. Federal Energy Regulatory Commission (Office of Energy Projects). 27 September 2011. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.