Ellisburg to Craigs Project
From the ProvenHand pipeline wiki
Ellisburg to Craigs Project is a natural gas pipeline in New York and Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2012. It runs 0.5 miles.
| Ellisburg to Craigs Project | |
|---|---|
| General information | |
| Kind | Pipeline project[1] |
| Status | In service[2] |
| Commodity | Natural gas[2] |
| Owner and operator | |
| States | New York, Pennsylvania[1] |
| Approved | 15 September 2011[1] |
| In service | 1 November 2012[2] |
| FERC docket | CP11-41[1] |
| Technical information | |
| Length | 0.5 mi[1] |
| Capacity | 150 MMcf/d (FERC project list)[1] |
| Cost | $44,438,082 (Exhibit K actuals: compressor and M&R costs)[3] |
| On ProvenHand | |
| Hands listed | 0 |
Ellisburg to Craigs Project is a natural gas pipeline in New York and Pennsylvania, operated by Dominion Transmission, Inc.. It entered service in 2012. It runs 0.5 miles.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Ellisburg to Craigs Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “Notification of In-Service, Ellisburg to Craigs Project (CP11-41)”. Dominion Transmission, Inc. (filed with FERC). 8 November 2012. Retrieved 4 October 2026.
- “Supplemental Information - Cost Completion Report, Ellisburg to Craigs Project (CP11-41)”. Dominion Transmission, Inc. (filed with FERC). 1 May 2013. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.