Elwood Power/ANR Horsepower Replacement Project

From the ProvenHand pipeline wiki

Elwood Power/ANR Horsepower Replacement Project is a natural gas pipeline replacement in Illinois, operated by TC Energy. It entered service in 2022.

Elwood Power/ANR Horsepower Replacement Project
General information
KindPipeline project[1]
Project typeReplacement[1]
StatusIn service[1]
CommodityNatural gas[1]
Operator
StateIllinois[1]
Announced30 July 2020[2]
In serviceNovember 2022[1]
Technical information
Capacity125 MMcf/d additional capacity (EIA)[1]
Cost$400 million (EIA estimate; no dollar year given)[1]
On ProvenHand
Hands listed0

Elwood Power/ANR Horsepower Replacement Project is a natural gas pipeline replacement in Illinois, operated by TC Energy. It entered service in 2022.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Elwood Power/ANR Horsepower Replacement Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  2. “TC Energy announces US$0.4 billion Elwood Power/ANR Horsepower Replacement Project (news release, Form 6-K exhibit)”. TC Energy Corporation (filed with the SEC). 30 July 2020. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.