EMRT Big Hollow Project

From the ProvenHand pipeline wiki

Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.

EMRT Big Hollow Project is a natural gas pipeline lateral in Illinois and Missouri, operated by Enable Mississippi River Transmission, LLC. It runs 9.6 miles of 20" pipe.

EMRT Big Hollow Project
Also calledAmeren – EMRT Big Hollow Project[1]
General information
KindPipeline project[1]
Project typeLateral[2]
StatusApproved[2]
CommodityNatural gas[2]
Owner and operator
StatesIllinois, Missouri[2][3]
CountiesIllinois: Monroe
Missouri: Jefferson
[4]
Approved10 June 2026[3][4]
FERC docketCP26-2[1]
Technical information
Length9.6 mi[2][3]
Pipe size20"[2]
Capacity200 MMcf/d (FERC project list)[2][3]
Cost$47.8 million (EIA estimate; no dollar year given)[2] or approximately $47,820,873[4][sources disagree]
On ProvenHand
Hands listed0

EMRT Big Hollow Project is a natural gas pipeline lateral in Illinois and Missouri, operated by Enable Mississippi River Transmission, LLC. It runs 9.6 miles of 20" pipe.

Crossings

FeatureMethod
Mississippi River[4]HDD

Sources disagree

These sources give different values for the same fact. Each value is listed with the sources that give it.

FactValues given
Cost
  • $47.8 million (EIA estimate; no dollar year given)[2]
  • approximately $47,820,873[4]

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on EMRT Big Hollow Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “FERC eLibrary docket CP26-2”. Federal Energy Regulatory Commission. 6 October 2025. Retrieved 3 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
  4. “Order Issuing Certificate, Enable Mississippi River Transmission, LLC, Ameren-EMRT Big Hollow Project (CP26-2)”. Federal Energy Regulatory Commission. 10 June 2026. Retrieved 3 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.