Enbridge East Texas System Extension

From the ProvenHand pipeline wiki

Enbridge East Texas System Extension is a natural gas pipeline expansion in Texas, operated by Enbridge Energy Pipeline Co. It entered service in 2008. It runs 190 miles of 36" pipe.

Enbridge East Texas System Extension
Also calledClarity[1]
General information
KindPipeline project[2]
Project typeExpansion[2]
StatusIn service[2]
CommodityNatural gas[2]
Operator
StateTexas[2]
In service15 April 2008[1][2]
Technical information
Length190 mi[2]
Pipe size36"[2][3]
Capacity700 MMcf/d additional capacity (EIA)[2][3]
Cost$465 million (EIA estimate; no dollar year given)[2]
On ProvenHand
Hands listed0

Enbridge East Texas System Extension is a natural gas pipeline expansion in Texas, operated by Enbridge Energy Pipeline Co. It entered service in 2008. It runs 190 miles of 36" pipe.

Crew on ProvenHand

No one on ProvenHand has listed this job yet.

Did you work on Enbridge East Texas System Extension? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.

Referencesedit

  1. “Enbridge Energy Partners, L.P. annual report on Form 10-K for the year ended December 31, 2008”. Enbridge Energy Partners, L.P. (filed with the SEC). 19 February 2009. Retrieved 4 October 2026.
  2. “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
  3. “Enbridge Energy Partners second quarter 2007 earnings release (8-K exhibit 99.1)”. Enbridge Energy Partners, L.P. (filed with the SEC). 1 August 2007. Retrieved 4 October 2026.

This pipeline article is a stub. You can help ProvenHand by expanding it.