Enbridge Energy Pipeline South Texas Expansion Project
From the ProvenHand pipeline wiki
Sources disagree on some of this page's facts. Each value is shown with its sources; see Sources disagree.
Enbridge Energy Pipeline South Texas Expansion Project is a natural gas pipeline reversal in Texas, operated by Enbridge Energy Pipeline Co.
| Enbridge Energy Pipeline South Texas Expansion Project | |
|---|---|
| Also called | Texas Eastern Transmission South Texas Expansion Project[1] |
| General information | |
| Kind | Pipeline project[2] |
| Project type | Reversal[3] |
| Status | In service[3][4] |
| Commodity | Natural gas[3][5] |
| Operator | |
| Owner and operator | |
| Facility project | |
| State | Texas[3][6] |
| Counties | Nueces[6] |
| Approved | 15 February 2018[2][5] |
| In service | 28 November 2018[3] or January 2019[4][sources disagree] |
| FERC docket | CP15-499[2] |
| Technical information | |
| Capacity | 400 MMcf/d (FERC project list)[2] or 396 MMcf/d additional capacity (EIA)[3][sources disagree] |
| Capacity added | 396,000 Dth per day of additional firm transportation service[5] |
| Cost | $137.3 million (EIA estimate; no dollar year given)[3] or $137,298,942 estimated cost of the project, as amended[5][sources disagree] |
| On ProvenHand | |
| Hands listed | 0 |
Enbridge Energy Pipeline South Texas Expansion Project is a natural gas pipeline reversal in Texas, operated by Enbridge Energy Pipeline Co.
Sources disagree
These sources give different values for the same fact. Each value is listed with the sources that give it.
| Fact | Values given |
|---|---|
| Capacity | |
| Cost | |
| In service |
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Enbridge Energy Pipeline South Texas Expansion Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “FERC eLibrary docket CP15-499”. Federal Energy Regulatory Commission. 22 May 2015. Retrieved 3 October 2026.
- “FERC: Approved Major Pipeline Projects (1997-Present)”. Federal Energy Regulatory Commission. Archived from the original on 1 July 2025. Retrieved 3 October 2026.
- “U.S. natural gas pipeline projects (Natural Gas Pipeline Projects)”. U.S. Energy Information Administration. Retrieved 3 October 2026.
- “Notice of Commencement of Service for the Mont Belvieu Compressor Station, South Texas Expansion Project (CP15-499)”. Texas Eastern Transmission, LP (filed with FERC). 25 January 2019. Retrieved 4 October 2026.
- “Order Issuing Certificate and Approving Abandonment, Texas Eastern Transmission, LP, South Texas Expansion Project (CP15-499)”. FERC. 15 February 2018. Retrieved 4 October 2026.
- “Notice of Commencement of Service, Petronila Compressor Station, South Texas Expansion Project (CP15-499)”. Texas Eastern Transmission, LP (filed with FERC). 7 January 2019. Retrieved 4 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.