Enbridge Interconnect Project
From the ProvenHand pipeline wiki
Enbridge Interconnect Project is a facility project in Texas, operated by Trunkline Gas Company, LLC. Construction began in 2008.
| Enbridge Interconnect Project | |
|---|---|
| General information | |
| Kind | Facility project[1] |
| Status | In service[2] |
| Owner and operator | |
| State | Texas[4] |
| Counties | Hardin[4] |
| Construction started | 1 April 2008[5] |
| FERC docket | CP08-61[3] |
| Technical information | |
| Capacity added | 40,000 decatherms per day (certificated capacity of the North Texas transmission system)[4] |
| Cost | $983,040[4] |
| On ProvenHand | |
| Hands listed | 0 |
Enbridge Interconnect Project is a facility project in Texas, operated by Trunkline Gas Company, LLC. Construction began in 2008.
Crew on ProvenHand
No one on ProvenHand has listed this job yet.
Did you work on Enbridge Interconnect Project? Add it to your work history on ProvenHand and get it confirmed by someone who was there. Sign in or join.
Referencesedit
- “Supplemental Notification (access road), Enbridge Interconnect Project (CP08-61)”. Trunkline Gas Company, LLC (filed with FERC). 27 August 2008. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 04 (April 21 through April 27, 2008), final report (CP08-61)”. Trunkline Gas Company, LLC (filed with FERC). 30 April 2008. Retrieved 3 October 2026.
- “FERC eLibrary docket CP08-61”. Federal Energy Regulatory Commission. 23 January 2008. Retrieved 3 October 2026.
- “Environmental Assessment Report, Trunkline Gas Company prior notice, abandonment and relocation of the Enbridge/Trunkline meter station (CP08-61)”. Federal Energy Regulatory Commission (Office of Energy Projects). 19 March 2008. Retrieved 3 October 2026.
- “Weekly Construction Status Report No. 1 (April 1 through April 6, 2008), Enbridge interconnect (CP08-61)”. Trunkline Gas Company, LLC (filed with FERC). 8 April 2008. Retrieved 3 October 2026.
This pipeline article is a stub. You can help ProvenHand by expanding it.